Healthcare Projects

Silver Lake Medical Center

Los Angeles, CA

  • Boiler plant replacement
  • CT scanner replacement

Connecticut Children's Medical Center

Hartford, CT

  • Air handling unit retrofit

Glendale Adventist Medical Center

Glendale, CA

  • Temporary emergency 225-ton air-cooled chiller addition to service laboratory building

Los Angeles County-USC Medical Center

Los Angeles, CA

  • Energy efficiency study for existing central cooling and heating plant

Memorial Hermann Northeast Hospital

Humble, TX

  • Cooling tower and boiler replacement
  • EMS upgrades

Parrish Medical Center

Titusville, FL

  • 600-ton Chiller replacement
  • 1000-kW Emergency generator addition
  • Cooling tower upgrades

Redlands Community Hospital

Redlands, CA

  • 450-ton Chiller plant replacement
  • 2000-ton Cooling tower replacement
  • EMS upgrades

Sharp Memorial Hospital & Medical Center

San Diego, CA

  • Central plant 1000-ton chiller replacement
  • Mary Birch air handling units replacement
  • North tower air handling unit retrofit
  • Laboratory building air handling units replacement
  • Chilled water loop upgrades
  • Electrical upgrades
  • Kitchen air handling unit replacement
  • Main Pharmacy air handling units replacement
  • Operating rooms air handling units replacement
  • Domestic Hot water storage tank to heat exchanger replacement

Simi Valley Hospital

Simi Valley, CA

  • 500-hp Steam boiler plant replacement
  • Air handling unit replacements and repair

UCLA Campus & Health System

Los Angeles, CA

  • College of Health Sciences (CHS) Building
    • 4th-floor ICU-to-office conversion
  • 200 UCLA Medical Plaza
    • 6th-floor telepresence
    • Care-Connect ALL building
    • Laboratory retrofit
    • Endoscope washer addition
  • Ronald Reagan UCLA Medical Center
    • ER pharmacy
    • ER lab extension
    • Maddie's Room retrofit
    • B-level Steinkamp art installation
    • Building security camera upgrades
    • Endoscope and Scrub-x units installation
  • Santa Monica-UCLA Medical Center and Orthopaedic Hospital
    • Scope washer replacement
    • MDF & IDF data center cooling system upgrades
      • IDF rooms
      • 100-ton Dedicated air-cooled chiller addition
    • Portable x-ray machine seismic anchorage
    • Credit union automatic teller machine seismic anchorage
    • MNP tower medical air plant replacement
    • Steam service to new MOB building
    • Patient dialysis boxes
    • 3rd-floor OR satellite pharmacy
    • MNP 4th & 5th-floors equipment anchorages
    • MNP SB1 substation transformer
    • New tower basement kitchen equipment anchorage
    • New tower servery equipment anchorage
  • UCLA South Campus Student Center
    • Mechanical and electrical utilities design
  • UCLA Sunset Village Housing
    • High voltage loop reconfiguration
  • Veterans Rehabilitation Building
    • Outpatient unit relocation
  • UCLA West Medical Building
    • Cyto genetics expansion
  • USC University Hospital

    Los Angeles, CA

    • Cafeteria servery remodel

    Verdugo Hills Hospital

    Glendale, CA

    • Two 450-ton chiller and cooling tower plant replacement
    • Air handling unit replacement and repair
    • EMS replacement
    • Energy efficiency study - lighting and water

    Whittier Hospital

    Whittier, CA

    • Emergency Room Building - 30-ton packaged air handling unit replacement

    St. Joseph Mission Hospital

    Mission Viejo, CA

    • Autoclave addition

    Straub Clinic & Hospital

    Honolulu, HI

    • Emergency power system study
    • Chiller water load and ventilation study

    California Pacific Medical Center - Davies Campus

    San Francisco, CA

    • 300-HP steam boiler and deaerator addition

    California Pacific Medical Center - Pacific Campus

    San Francisco, CA

    • 200-HP steam boiler addition

    California Pacific Medical Center - California Campus

    San Francisco, CA

    • 2 100-HP steam boiler addition

    Western Medical Center

    Santa Ana, CA

    • Special procedure angiography remodel